Weekdays
AM 09:00 ~ PM 6:00
Closed on Saturdays, Sundays, and public holidays
Automatic Building Control Division 02 Power Control System
The power control system automatically collects, classifies, analyzes, and displays data (T/D, electronic digital relay) transmitted from electrical facilities (distributors, MCCs, and generators) on the monitor so that the building's power system can be monitored at a glance to prevent accidents and to control the power system for the purpose of efficiency and saving energy.
Breakers (VCB/ACB), relays (OCR,OCGR...)
Voltage (V-3 phase), current (A-3 phase), power (KW), power (KWH), power rate (PF), frequency (HZ), direct current (DCA), direct voltage(DCV), etc.
When the remote circuit breaker is installed or blocked, it is controlled from a monitoring room away from the site.
The PEAK value is set so that the maximum amount of electricity used (contract power) does not exceed the peak numbers, and is automatically adjusted according to the importance of the load when the load is expected to exceed the peak amount of power used. This reduces the additional burden of electricity charges and saves energy.
In the event of power outage, the load can be switched on and off sequentially according to a pre-written power failure scenario, thereby preventing accidents and damage caused.
The power distribution report is automatically completed and printed out per a pre-designated format (daily and monthly).
The security rating for each user is set according to the importance of each function to prevent arbitrary SYSTEM access and external control.